System overhaul kit, for systems with 1 1/4" vessels with FSV or Quantum and Apollo-600
The Clemco overhaul kit system is a comprehensive maintenance kit for compatible 1 1/4-inch pressure blast pots with an FSV or Quantum metering valve and Apollo-600 respiratory protection system. It supports the planned joint overhaul of blasting and safety-related components. The pot model, serial number, valve version, and Apollo-600 configuration must be verified unambiguously before ordering. The exact scope of delivery is based on the current Clemco parts list for item 27236D.
Tax-free EU delivery after VAT ID verification at checkout
Free delivery within Germany on orders over €99
System overhaul kit, for systems with 1 1/4" vessels with FSV or Quantum and Apollo-600 ...è stato ordinato al fornitore e verrà spedito non appena sarà di nuovo disponibile.
Questions & Help
Questions & Help
Do you have questions about one of our products or would you like expert advice on selecting the right solution for your application?
No problem—give us a call! Tel. +49 (0) 2551 5030
Send us an email! shop@strahltechnik-express.de
Use our online chat or the contact form
Leasing & Hire Purchase
Leasing & Hire Purchase
We offer the financing options leasing and hire purchase exclusively to businesses, commercial operators and self-employed persons for selected products with a net order value of €1,000 or more. Below you will find the key differences between the two forms of financing.
Leasing
With leasing, the product is made available to the lessee for use in return for regular lease payments. The asset is recognized on the lessor’s balance sheet. Lease payments can generally be claimed as operating expenses for tax purposes. These are gross payments, and VAT is charged throughout the entire term. Once the agreed minimum lease term has expired, purchasing the product is generally possible.
Hire purchase
In economic terms, hire purchase is equivalent to an installment purchase. The product is capitalized on the hire purchaser’s balance sheet and depreciated in accordance with the official depreciation tables. Ownership of the asset transfers to the hire purchaser upon payment of the final hire-purchase installment. VAT must be paid in full with the first hire-purchase installment (a pass-through item).
Shipping & Delivery
Shipping & Delivery
We ship our goods either via parcel service or via a freight forwarding company, depending on their size, weight and characteristics. We select the shipping method at our reasonable discretion.
The delivery times stated in the online shop are non-binding estimates, unless a binding delivery date has been expressly agreed in writing. They are based on the information available from our manufacturers, suppliers and logistics partners at the time the order is placed.
A large proportion of the products offered are shipped directly from the manufacturer or from external central warehouses (direct shipment). As a result, delivery times may differ from the stated guidelines. In particular, material shortages, production delays, supply bottlenecks, force majeure or other circumstances for which we are not responsible may result in delivery delays.
Disclaimer:
We accept no liability for delivery delays resulting from circumstances beyond our control. This applies in particular to delays caused by manufacturers, upstream suppliers, transport companies or other third parties. Liability for any resulting damages, in particular indirect damages, consequential damages or loss of profit, is excluded to the extent permitted by law.
Partial deliveries are permitted insofar as they are reasonable for the customer. They will not result in additional shipping costs unless otherwise agreed.
The exact delivery time for an item can be provided individually on request, either before or after placing the order.
Please contact us by telephone at +49 (0)2551 5030 or by email at shipping@strahltechnik-express.de.
If significant delivery delays occur, we will inform the customer without undue delay. Mandatory statutory rights of the customer remain unaffected.
System overhaul kit, for systems with 1 1/4" vessels with FSV or Quantum and Apollo-600 ...è stato ordinato al fornitore e verrà spedito non appena sarà di nuovo disponibile.
Clemco System Overhaul Kit – for 1 1/4-inch vessels with FSV or Quantum and Apollo 600
The Clemco System Overhaul Kit is designed as a comprehensive maintenance kit for suitable pressure blast machines with 1 1/4-inch vessel piping, an FSV or Quantum metering valve, and an Apollo-600 respiratory protection system. It supports the joint overhaul of the blasting and safety-relevant system components.
Bundled maintenance facilitates scheduled servicing and reduces the risk of worn seals or system components only being noticed during operation. Exact compatibility must be confirmed based on the vessel model, serial number, metering valve, and Apollo-600 configuration.
✅ Comprehensive system overhaul kit
✅ For 1 1/4-inch vessels with FSV or Quantum
✅ Includes the Apollo-600 system
✅ For scheduled preventive maintenance
✅ Original Clemco system assignment
✅ Supports operational safety and system availability
Technical assignment
| Product type | System overhaul kit |
| Vessel system | 1 1/4 inch |
| Metering valve | FSV or Quantum K |
| Respiratory protection reference | Clemco Apollo 600 |
| Item number | 27236D |
Inspection points before ordering
✔ Vessel model, serial number, and year of manufacture
✔ 1 1/4-inch piping
✔ FSV or Quantum metering valve
✔ Configuration and year of manufacture of the Apollo-600 system
✔ Existing breathing-air components and connections
Revision and functional inspection
Before servicing, fully depressurize the pressure blast machine, empty the abrasive, and disconnect the breathing-air supply. Clean sealing surfaces, threads, valve seats, hoses, and connections, and inspect them for mechanical damage. Respiratory protection components may only be serviced according to the manufacturer's instructions and repaired using approved parts.
After completion, leak tightness, the start/stop function, complete venting, abrasive metering, and the breathing-air supply must be checked separately and then verified in the system. Damaged components or components that cannot be clearly identified must not be used further.
FAQ – frequently asked questions
Is the set only for the vessel?
No, it is intended as a system set associated with the Apollo-600 system.
Is the content identical for every system?
The current bill of materials applies to item 27236D; compatibility and configuration must nevertheless be checked.
Can the breathing-air system be modified as desired?
No, safety-relevant breathing-air components may only be serviced and combined in accordance with Clemco specifications.
Payment & Security
Payment methods
Your payment information is processed securely. We do not store credit card details and do not have access to your credit card information.
In addition, mollie offers you many other payment methods at checkout!
