{"product_id":"clemco-revisions-set-system-fur-systeme-mit-1-1-4-kessel-mit-fsv-oder-quantum-und-apollo-600","title":"System overhaul kit, for systems with 1 1\/4\" vessels with FSV or Quantum and Apollo-600","description":"\u003cdiv style=\"max-width:980px;margin:0 auto;line-height:1.65;color:#222;\"\u003e\n\u003ch5\u003eClemco System Overhaul Kit – for 1 1\/4-inch vessels with FSV or Quantum and Apollo 600\u003c\/h5\u003e\n\u003cp\u003eThe Clemco System Overhaul Kit is designed as a comprehensive maintenance kit for suitable pressure blast machines with 1 1\/4-inch vessel piping, an FSV or Quantum metering valve, and an Apollo-600 respiratory protection system. It supports the joint overhaul of the blasting and safety-relevant system components.\u003c\/p\u003e\n\u003cp\u003eBundled maintenance facilitates scheduled servicing and reduces the risk of worn seals or system components only being noticed during operation. Exact compatibility must be confirmed based on the vessel model, serial number, metering valve, and Apollo-600 configuration.\u003c\/p\u003e\n\u003cdiv style=\"background:#f5f5f7;border-radius:10px;padding:15px 17px;margin:18px 0;\"\u003e\n\u003cstrong\u003eYour benefits\u003c\/strong\u003e\u003cbr\u003e✅ Comprehensive system overhaul kit\u003cbr\u003e✅ For 1 1\/4-inch vessels with FSV or Quantum\u003cbr\u003e✅ Includes the Apollo-600 system\u003cbr\u003e✅ For scheduled preventive maintenance\u003cbr\u003e✅ Original Clemco system assignment\u003cbr\u003e✅ Supports operational safety and system availability\u003c\/div\u003e\n\u003chr\u003e\n\u003ch5\u003eTechnical assignment\u003c\/h5\u003e\n\u003cdiv style=\"overflow-x:auto;border:1px solid #d9dee3;border-radius:10px;margin:16px 0;\"\u003e\u003ctable style=\"width:100%;border-collapse:separate;border-spacing:0;min-width:680px;\"\u003e\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd style=\"padding:11px 12px;background:#eef1f3;font-weight:700;\"\u003eProduct type\u003c\/td\u003e\n\u003ctd style=\"padding:11px 12px;\"\u003eSystem overhaul kit\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"background:#f8f9fa;\"\u003e\n\u003ctd style=\"padding:11px 12px;font-weight:700;\"\u003eVessel system\u003c\/td\u003e\n\u003ctd style=\"padding:11px 12px;\"\u003e1 1\/4 inch\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"padding:11px 12px;background:#eef1f3;font-weight:700;\"\u003eMetering valve\u003c\/td\u003e\n\u003ctd style=\"padding:11px 12px;\"\u003eFSV or Quantum K\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"background:#f8f9fa;\"\u003e\n\u003ctd style=\"padding:11px 12px;font-weight:700;\"\u003eRespiratory protection reference\u003c\/td\u003e\n\u003ctd style=\"padding:11px 12px;\"\u003eClemco Apollo 600\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"padding:11px 12px;background:#eef1f3;font-weight:700;\"\u003eItem number\u003c\/td\u003e\n\u003ctd style=\"padding:11px 12px;\"\u003e27236D\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\u003c\/table\u003e\u003c\/div\u003e\n\u003chr\u003e\n\u003ch5\u003eInspection points before ordering\u003c\/h5\u003e\n\u003cp\u003e✔ Vessel model, serial number, and year of manufacture\u003c\/p\u003e\n\u003cp\u003e✔ 1 1\/4-inch piping\u003c\/p\u003e\n\u003cp\u003e✔ FSV or Quantum metering valve\u003c\/p\u003e\n\u003cp\u003e✔ Configuration and year of manufacture of the Apollo-600 system\u003c\/p\u003e\n\u003cp\u003e✔ Existing breathing-air components and connections\u003c\/p\u003e\n\u003chr\u003e\n\u003ch5\u003eRevision and functional inspection\u003c\/h5\u003e\n\u003cp\u003eBefore servicing, fully depressurize the pressure blast machine, empty the abrasive, and disconnect the breathing-air supply. Clean sealing surfaces, threads, valve seats, hoses, and connections, and inspect them for mechanical damage. Respiratory protection components may only be serviced according to the manufacturer's instructions and repaired using approved parts.\u003c\/p\u003e\n\u003cp\u003eAfter completion, leak tightness, the start\/stop function, complete venting, abrasive metering, and the breathing-air supply must be checked separately and then verified in the system. Damaged components or components that cannot be clearly identified must not be used further.\u003c\/p\u003e\n\u003chr\u003e\n\u003ch5\u003eFAQ – frequently asked questions\u003c\/h5\u003e\n\u003cp\u003e\u003cstrong\u003eIs the set only for the vessel?\u003c\/strong\u003e\u003cbr\u003eNo, it is intended as a system set associated with the Apollo-600 system.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eIs the content identical for every system?\u003c\/strong\u003e\u003cbr\u003eThe current bill of materials applies to item 27236D; compatibility and configuration must nevertheless be checked.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eCan the breathing-air system be modified as desired?\u003c\/strong\u003e\u003cbr\u003eNo, safety-relevant breathing-air components may only be serviced and combined in accordance with Clemco specifications.\u003c\/p\u003e\n\u003c\/div\u003e","brand":"Clemco","offers":[{"title":"Default Title","offer_id":52744541536603,"sku":"27236D","price":393.41,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0876\/8526\/7803\/files\/revisions-set-system-clemco-27236d.jpg?v=1775215819","url":"https:\/\/ae6ea8-95.myshopify.com\/hu-ee\/products\/clemco-revisions-set-system-fur-systeme-mit-1-1-4-kessel-mit-fsv-oder-quantum-und-apollo-600","provider":"ABS Strahltechnik","version":"1.0","type":"link"}