Vessel overhaul kit, for 1 1/4" vessels with FSV or Quantum
The Clemco vessel service kit is intended for the professional maintenance of compatible 1 1/4-inch pressure blast vessels with an FSV or Quantum abrasive metering valve. This coordinated service kit supports leak-tight connections, reliable switching operations, and a consistent abrasive flow. Before ordering, the vessel model, serial number, year of manufacture, and installed metering valve must be checked. The exact scope of delivery is based on the current Clemco bill of materials for item 27237D.
Tax-free EU delivery after VAT ID verification at checkout
Free delivery within Germany on orders over €99
Vessel overhaul kit, for 1 1/4" vessels with FSV or Quantum est en rupture de stock et sera expédié dès qu’il sera de retour en stock.
Questions et aide
Questions et aide
Affichez des informations générales sur le produit ou des informations spécifiques sur le produit à l'aide de métachamps.
Leasing & Hire Purchase
Leasing & Hire Purchase
We offer the financing options leasing and hire purchase exclusively to businesses, commercial operators and self-employed persons for selected products with a net order value of €1,000 or more. Below you will find the key differences between the two forms of financing.
Leasing
With leasing, the product is made available to the lessee for use in return for regular lease payments. The asset is recognized on the lessor’s balance sheet. Lease payments can generally be claimed as operating expenses for tax purposes. These are gross payments, and VAT is charged throughout the entire term. Once the agreed minimum lease term has expired, purchasing the product is generally possible.
Hire purchase
In economic terms, hire purchase is equivalent to an installment purchase. The product is capitalized on the hire purchaser’s balance sheet and depreciated in accordance with the official depreciation tables. Ownership of the asset transfers to the hire purchaser upon payment of the final hire-purchase installment. VAT must be paid in full with the first hire-purchase installment (a pass-through item).
Shipping & Delivery
Shipping & Delivery
We ship our goods either via parcel service or via a freight forwarding company, depending on their size, weight and characteristics. We select the shipping method at our reasonable discretion.
The delivery times stated in the online shop are non-binding estimates, unless a binding delivery date has been expressly agreed in writing. They are based on the information available from our manufacturers, suppliers and logistics partners at the time the order is placed.
A large proportion of the products offered are shipped directly from the manufacturer or from external central warehouses (direct shipment). As a result, delivery times may differ from the stated guidelines. In particular, material shortages, production delays, supply bottlenecks, force majeure or other circumstances for which we are not responsible may result in delivery delays.
Disclaimer:
We accept no liability for delivery delays resulting from circumstances beyond our control. This applies in particular to delays caused by manufacturers, upstream suppliers, transport companies or other third parties. Liability for any resulting damages, in particular indirect damages, consequential damages or loss of profit, is excluded to the extent permitted by law.
Partial deliveries are permitted insofar as they are reasonable for the customer. They will not result in additional shipping costs unless otherwise agreed.
The exact delivery time for an item can be provided individually on request, either before or after placing the order.
Please contact us by telephone at +49 (0)2551 5030 or by email at shipping@strahltechnik-express.de.
If significant delivery delays occur, we will inform the customer without undue delay. Mandatory statutory rights of the customer remain unaffected.
Vessel overhaul kit, for 1 1/4" vessels with FSV or Quantum est en rupture de stock et sera expédié dès qu’il sera de retour en stock.
Clemco Vessel Overhaul Kit – for 1 1/4-inch systems with FSV or Quantum
The Clemco Vessel Overhaul Kit is intended for preventive maintenance and professional overhaul of suitable pressure blast vessels with 1 1/4-inch piping and FSV or Quantum abrasive metering valves. It combines the wear and sealing components specified for the respective system overhaul in a coordinated maintenance kit.
Regular overhauls support reliable switching operations, leak-tight connections, and a consistent abrasive flow. Since Clemco systems may be configured differently depending on the year of manufacture and equipment, the vessel model, serial number, and existing metering valve must be checked before ordering.
✅ Coordinated overhaul kit for Clemco vessel systems
✅ For 1 1/4-inch vessel piping
✅ For systems with FSV or Quantum
✅ Supports preventive maintenance
✅ Reduces downtime through bundled maintenance parts
✅ Original Clemco maintenance solution
Technical assignment
| Product type | Vessel overhaul kit |
| System size | 1 1/4 inches |
| Metering valves | FSV or Quantum K |
| Application | Maintenance and overhaul of the vessel system |
| Item number | 27237D |
Check compatibility before ordering
| Inspection point | Required information |
|---|---|
| Vessel model | Type plate or equipment designation |
| Serial number/year of manufacture | For unambiguous parts identification |
| Metering valve | FSV or Quantum K |
| Piping | Confirm 1 1/4 inches |
Maintenance and assembly
The exact composition is based on the current Clemco parts allocation. Before starting, completely depressurize the vessel, empty the abrasive, and secure the system against being switched on again. Clean sealing surfaces, threads, and valve seats; do not improvise or rework worn components individually.
After the overhaul, first perform a leak, switching, and venting test without abrasive. The system may only be operated with abrasive again once it has functioned flawlessly.
FAQ – frequently asked questions
Is the set compatible with every Clemco vessel?
No, the system size, metering valve, and equipment configuration must match.
Which parts are included exactly?
The exact contents are based on the current Clemco bill of materials for item 27237D.
Can the overhaul be carried out under pressure?
No, the system must be completely depressurized, emptied, and secured.
Paiement et sécurité
Modes de paiement
Vos informations de paiement sont traitées de manière sécurisée. Nous ne stockons pas les détails de votre carte de crédit et n'avons pas accès aux informations de votre carte de crédit.
In addition, mollie offers you many other payment methods at checkout!
